bridge piling gauge

Report

Account The level is gauged by the river left bridge piling at the put-in otherwise known as "the unit". 0" is indicated by the line and stage is measured either or above or below this reference. Levels between -4" and 6" are good for first-time runs.
River Reported Canyon Creek
Reporter
Author of report
Thomas O'Keefe
3537 NE 87th St.
Seattle, WA 98115
Phone: 425-417-9012
River
Canyon Creek (Lewis River Trib.) [WA]
low
01h08m
Photos/Videos page 1 of 1

bridge piling gauge

Detail Trip Report  bridge piling gauge  Canyon Creek, WA(99.66KB .jpeg)


No Comments

Users can submit comments.