| Account | Looking downstream from the Headworks put-in at Palmer. Engineered log jam on the Headworks run constructed by Army Corps of Engineers. The rapid behind the watershed office on the Green Headworks. A fun rapid and also an alternate access. Having fun on the eddy line. Fun surfing as you pass the pipeline. The most challenging drop on this section where a riverwide ledge rapid is encountered just downstream of the railroad bridge. Fun surf ledges on the Headworks run. Final boulder garden rapid before the take-out for the Headworks run. |
|---|---|
| Time | 2008-04-26 04:00:00 GMT |
| Reported Date | 1209182400 |
| River Reported | Green |
| Reporter | Author of report Thomas O'Keefe 3537 NE 87th St. Seattle, WA 98115 E-mail: okeefe@americanwhitewater.org Phone: 425-417-9012 |
| River |
Green [WA]
|
| Reported Level | 890 cfs |
No Comments
Users can submit comments.
(KML)help