Take-Out

Report

Account The Put-In as seen from Tommy Creek Trailhead bridge. Tommy Creek Bridge seen in the background. Plenty of action, no real chance for a warmup. There was wood in the top of this drop.
Time 2008-07-04 04:00:00 GMT
Reported Date 1215144000
River Reported Entiat
Reporter
Author of report
Chris Arnold
Madison, wi
River
Reported Level 1150cfs
Photos/Videos page 1 of 10

Entiat_Canyon_Put-In

Detail Trip Report  Entiat_Canyon_Put-In  Entiat, WA(2.81MB .jpeg)

Put-In Rapid

Detail Trip Report  Put-In Rapid  Entiat, WA(2.43MB .jpeg)

First Drop in the Canyon

Detail Trip Report  First Drop in the Canyon  Entiat, WA(2.17MB .jpeg)

Third Drop in theCanyon

Detail Trip Report  Third Drop in theCanyon  Entiat, WA(2.38MB .jpeg)

Just Below the Second Canyon Drop

Detail Trip Report  Just Below the Second Canyon Drop  Entiat, WA(2.71MB .jpeg)

End of Canyon

Detail Trip Report  End of Canyon  Entiat, WA(2.54MB .jpeg)

Last Drop Lead-In

Detail Trip Report  Last Drop Lead-In  Entiat, WA(3.31MB .jpeg)

Entiat River Last Drop

Detail Trip Report  Entiat River Last Drop  Entiat, WA(2.45MB .jpeg)

Last Drop Bottom

Detail Trip Report  Last Drop Bottom  Entiat, WA(2.18MB .jpeg)

Take-Out

Detail Trip Report  Take-Out  Entiat, WA(3.26MB .jpeg)


No Comments

Users can submit comments.

  (RSS)  
  (KML)help  
  (mobile)