2005 Change @ Cucumber

Report

Account The “normal” line at Cucumber has been narrowed by about 2 ft. with the deposit of a new rock from beginning of the 2005 season. This new rock interferes with the eddy catch behind Table Rock and protrudes about 1.5 ft. into the current at low to normal flows (1.5 to 2.5 ft.). At higher flows (3 ft. +), the new rock may not be an issue.
Time 2005-06-28 20:00:00 GMT
Reported Date 6-28-05
River Reported Youghiogheny
Reporter
Author of report
jeff macklin
jeannette, pa
River
Youghiogheny [PA]
6. Lower III
med
00h34m
Reported Level 1.6
Photos/Videos page 1 of 1

2005 Change @ Cucumber

Detail Trip Report  2005 Change @ Cucumber  Youghiogheny, PA(118.97KB .jpeg)


No Comments

Users can submit comments.