Mill Creek (Hudson trib.), New York, US
|
|
Johnsburg (above Wevertown) to Hudson River
| Usual Difficulty |
I-IV(V) (for normal flows) |
| Length |
4 Miles |
| Avg. Gradient |
33 fpm |
| Max Gradient |
80 fpm |
Gauge Information
River Description
The longest trip involves putting in just upstream of the culvert under South
Johnsburg Road. Immediately after exiting the culvert you fly over a 10 foot waterfall (see
photos). I call this 'Pipe Dream'. Be careful to scout the landing first. The next 1.5 miles
involves lovely 80 fpm rapids down to the route 28 bridge. From here you have a short stretch of
flatwater which ends at a (possibly unrunable) mill dam waterfall - carry on the right. Another
mile of boogy water brings you to the 'Black Hole' slide - beware the pinning rock on the right.
You can take-out here, or run a short rapid (IV) down to the Hudson River, which has pleasant
rapids (II/III) down to The Glen.
StreamTeam Status: Not Verified
Last Updated: 2008-04-16 13:37:11
Editors