Klamath - 1) Iron Gate Dam to Sarah Totten CG


Klamath, California, US

Disclaimer

1) Iron Gate Dam to Sarah Totten CG

Usual Difficulty I-II (for normal flows)
Length 48 Miles

Iron Gate Dam


Iron Gate Dam
Photo by Thomas O'Keefe В© taken 12/07/06

Gauge Information

Name Range Difficulty Updated Level
KLAMATH R BL IRON GATE DAM CA
usgs-11516530 500 - 50000 cfs I-II 01h26m 1000 cfs (rc= 0.0 )


River Description

From Tree of Heaven campground to Gottville is a very good beginner run. The run has many class 2 rapids, 3 class 2+ rapids and 1 class 3- rapid (at Lumgrey Creek) It is also home to the Schoolhouse Wave, this neck of the woods favorite summer playspot. It's located just downstream of milepost 93.5 (If I remember my milepost right). Friendly flows for Schoolhouse are 900 to 1,150 (Iron Gate plus Shasta) It may be a narrow range but most summers it's in from July thru Sept. 24/7. Dry years upstream can change the flow regime and two out of the last three years in August flows out of Iron Gate jumped to 1,400cfs but came back down after three or four days. so give the internet a check before you head out. Also water quality that has always been suspect has now confirmed to be not good and the last few years warnings have been issued to avoid contact (esp dogs) by the North Coast regional water quality board usually in mid August for toxic blue green algae that originates from upstream reservoirs. Which has cut down my playtime as I go elsewhere. 
Nick Sinderson  2011.

 

Other information sources:
CaCreeks
Wikipedia
Klamath water controversy info
EPA map, pdf


StreamTeam Status: Not Verified
Last Updated: 2011-09-28 06:42:43

Iron Gate Dam

Detail Trip Report  Iron Gate Dam  Klamath, CA(2.19MB .jpeg)


Gauge Information

We have no additional information about how various flows affect runnability (or playability) of this section of river. If you can provide additional information, please either directly contact the StreamTeam member for this reach, or add a 'comment' or a 'report' with your information to help out your fellow boaters.

Gauge Information

Name Range Difficulty Updated Level
KLAMATH R BL IRON GATE DAM CA
usgs-11516530 500 - 50000 cfs I-II 01h26m 1000 cfs (rc= 0.0 )

RangeWater LevelDifficultyComment
500 -50000 cfs barely runnable-high runnable I-II

Report - Reports of Klamath 1) Iron Gate Dam to Sarah Totten CG and related gauges

Reports give the public a chance to report on river conditions throughout the country as well as log the history of a river.

Reports

When River/Gauge Subject Level Reporter
5y67d13h41m Klamath [CA] Iron Gate Dam n/a Thomas O'Keefe

WXPort

News




User Comments


2011-01-05 11:25:22 (402 days ago)
Nick SindersonDetails
From Tree of Heaven campground to Gottville is a very good beginner run. The run has many class 2
rapids, 3 class 2+ rapids and 1 class 3- rapid (at Lumgrey Creek) It is also home to the
Schoolhouse Wave, this neck of the woods favorite summer playspot. It's located just downstream of
milepost 93.5 (If I remember my milepost right). Friendly flows for Schoolhouse are 900 to 1,150
(Iron Gate plus Shasta) It may be a narrow range but most summers it's in from July thru Sept.
24/7. Dry years upstream can change the flow regime and two out of the last three years in August
flows out of Iron Gate jumped to 1,400cfs but came back down after three or four days. so give the
internet a check before you head out. Also water quality that has always been suspect has now
confirmed to be not good and the last few years warnings have been issued to avoid contact (esp
dogs) by the North Coast regional water quality board usually in mid August for toxic blue green
algae that originates from upstream reservoirs. Which has cut down my playtime as I go elsewhere.
Users can submit comments.

Rapid Summary

Mile Rapid Name Class Features (Legend)
15.0Tree of Heaven CampgroundN/AAccess
20.0Lumgrey Creek rapidIII

Rapid Descriptions

Lumgrey Creek rapid (Class III, Mile 20.0)

These rapids may be the most difficult on this section.




Do more than just check gauges; join over 5,000 AW members today.

Join_or_Renew_Logo-200px

Join or Renew


Or, consider donating

Donate_Logo-200px

Donate


Associated News

AW Weighs in on Klamath River (OR/CA)

Klamath River Restoration Public Comment Period Open (OR/CA)


Associated Projects

General Nonmember Message


 reach  
 state  
 reachlink  
 1) Iron Gate Dam to Sarah Totten CG , Klamath California, US (mobile)