Pit - (Pit 5) Pit 5 Dam to Pit 5 Powerhouse


Pit, California, US

Disclaimer

(Pit 5) Pit 5 Dam to Pit 5 Powerhouse

Usual Difficulty III+(V) (for normal flows)
Length 9 Miles
Avg. Gradient 45 fpm
Max Gradient 100 fpm

Upper Spillway Pit 5


Upper Spillway Pit 5
Photo by Dave Steindorf

Gauge Information

Name Range Difficulty Updated Level
Pit River at Big Bend
pge-PH27 800 - 4000 cfs III+(V) 03h15m 650 cfs (rc= -0.0 )


River Description

The Pit 5 reach offers both a class III run and a Class V run.  The Class V run begins just below the Pit 5 Dam.  The first rapid below the dam is very brushy.  This rapid can be avoided by putting in below.  If you do not wish to paddle the class III section, you can take out at the Bridge in Big Bend. 

The Class III section begins at the bridge in Big Bend.  Take out is just above the Pit 5 powerhouse.

Spring releases will be occurring on the Pit 3, 4 and 5 reaches as part of the new license that American Whitewater helped to negotiate.  Real time flow information is now available on the American Whitewater Website since mid 2008.   Also look to the release calendar on this page  for scheduled flow releases.  Look to the release calendar page

for release information in California and across the Country.

Other Information Sources:
SIERRA WHITEWATER, MARTIN, 1974
AW-PG&E flow page
1-866-629-3925 AW-PG&E Flow Phone


StreamTeam Status: Not Verified
Last Updated: 2011-10-31 20:28:02

Pit 5 Class V

Detail Trip Report  Pit 5 Class V  Pit , CA(103.09KB .jpeg)


Gauge Information

Gauge Description:

AW-PG&E flow page
1-866-629-3925 AW-PG&E Flow Phone

Look to the AW release calendar on this page  for schedules of flow releases.  Look to the release calendar page for release information in California and across the Country.

Realtime flow information is also available at CDEC Pit River at Big Bend
Historical data for this reach is available at the USGS page for this gauge #11363000.    Gauge site information  
This USGS Pit/McCloud Schematic.pdf  shows dams, diversions, reservoirs and gauges.  
The AW - PG&E Flows Page shows a number of other PG&E flow reports on different river reaches.

 

LOCATION.--Lat 41°01'10", long 121°54'36" referenced to North American Datum of 1927, in NW ¼ SW ¼ sec.31, T.37 N., R.1 E., Shasta County, CA, Hydrologic Unit 18020003, on left bank at Big Bend, 0.4 mi downstream from Nelson Creek, 1.5 mi upstream from Kosk Creek, and 3.1 mi downstream from Pit No. 5 Dam.
DRAINAGE AREA.--4,711 mi2, excluding Goose Lake Basin.

 

The provisional flow data provided below has not been reviewed or edited, and may be subject to significant change.

Gauge Information

Name Range Difficulty Updated Level
Pit River at Big Bend
pge-PH27 800 - 4000 cfs III+(V) 03h15m 650 cfs (rc= -0.0 )

RangeWater LevelDifficultyComment
800 -4000 cfs barely runnable-high runnable III+(V)

Report - Reports of Pit (Pit 5) Pit 5 Dam to Pit 5 Powerhouse and related gauges

Reports give the public a chance to report on river conditions throughout the country as well as log the history of a river.

Reports

When River/Gauge Subject Level Reporter
9y178d23h15m Pit [CA] Pit 5 Class V 1800 Dave Steindorf

WXPort

News




No Comments

Users can submit comments.

Rapid Summary

Mile Rapid Name Class Features (Legend)
3.1Big Bend BridgeAccess

Rapid Descriptions

Big Bend Bridge

The river has class 5 upstream of this access point, but is only class 3 below this bridge. 




Do more than just check gauges; join over 5,000 AW members today.

Join_or_Renew_Logo-200px

Join or Renew


Or, consider donating

Donate_Logo-200px

Donate


General Nonmember Message

Associated News

PG&E Flows


Events

No Events Scheduled
  (iCal)  


 reach  
 state  
 reachlink  
 (Pit 5) Pit 5 Dam to Pit 5 Powerhouse, Pit California, US (mobile)