Colorado - 06. Hanging Lake Exit 125 (I-70) to Shoshone Power Plant Exit 123 (I-70)


Colorado, Colorado, US

Disclaimer

06. Hanging Lake Exit 125 (I-70) to Shoshone Power Plant Exit 123 (I-70) (Barrel Springs)

Usual Difficulty IV-V(V+) (for normal flows)
Length 3.8 Miles
Avg. Gradient 83 fpm

Upper Death (5)


Upper Death (5)
Photo by Kit Davidson taken 09/16/04 @ 1200 cfs

Gauge Information

Name Range Difficulty Updated Level
COLORADO RIVER NEAR DOTSERO, CO
usgs-09070500 1300 - 5000 cfs IV-V(V+) 67d13h22m 900 cfs (rc= -0.1 )


River Description

Chris Cambron notes:
"This run is less than 15 minutes east of Glenwood Springs, CO on Interstate 70. You can see the run from the road (if you're looking for it) - but there's a walking path all along river right from where you can scout everything if you get off at the Shoshone exit and head upstream. The section above Shoshone exit 123 is a kayakers run - the rafts tend to stay on the run just below that. I mainly stick to the rafts so I really couldn't tell you much about it other than it has some big scary holes that I would never take a raft into. At high water (anything over 4-5000 cfs), it is downright terrifying."

Reaches of the Colorado River:
01. Hot Sulphur Springs to Hwy 40 bridge (Byers Canyon) (CO, IV)
02. Gore Canyon (CO, IV-V)
03. Pumphouse campground to Rancho Del Rio (Pumphouse) (CO, III)
04. Hanging Lake Exit 125 (I-70) to Shoshone Power Plant Exit 123 (I-70) (Barrel Springs) (CO, IV-V [V+])
05. Shoshone Power Plant, Exit 123 (I-70) to Grizzly Creek, Exit 121 (I-70) (Shoshone) (CO, III-IV)
06. Cameo Dam (Big Sur / Lucky 7) (CO, III)
07. Loma to Westwater (Ruby / Horsethief Canyons) (CO-UT, II)
08. Westwater to Rose Ranch (Westwater Canyon) (UT, I-IV)
09. Cisco (Rose Ranch) to Moab (Professor Valley) (UT, I-III)
10. Moab to Powell Reservoir (Cataract Canyon) (UT, I-IV)
11. Lees Ferry to Lake Mead (Grand Canyon) (AZ, I-V)
12. Black Canyon (AZ-NV, I)
StreamTeam Status: Not Verified
Last Updated: 2009-11-20 22:11:25

Glenwood Canyon

Detail Trip Report  Glenwood Canyon  Colorado, CO(13.90KB .jpeg)

Upper Death (1)

Detail Trip Report  Upper Death (1)  Colorado, CO(142.99KB .jpeg)

Upper Death (2)

Detail Trip Report  Upper Death (2)  Colorado, CO(146.42KB .jpeg)

Barrel Springs

Detail Trip Report  Barrel Springs  Colorado, CO(150.95KB .jpeg)

Scary Hole

Detail Trip Report  Scary Hole  Colorado, CO(139.90KB .jpeg)

Upper Death (5)

Detail Trip Report  Upper Death (5)  Colorado, CO(148.21KB .jpeg)

Upper Death (4)

Detail Trip Report  Upper Death (4)  Colorado, CO(140.09KB .jpeg)

Hole At Bottom Of Dam

Detail Trip Report  Hole At Bottom Of Dam  Colorado, CO(138.15KB .jpeg)

Upper Death (3)

Detail Trip Report  Upper Death (3)  Colorado, CO(140.69KB .jpeg)


Gauge Information

Gauge Description:

The tunnel pulls out approximately 1000 cfs.  So at 1300 cfs you will have about 300 cfs in the river--clearly enough to boat, but not great 'til it hits 1500 to 1800 cfs.

Gauge Information

Name Range Difficulty Updated Level
COLORADO RIVER NEAR DOTSERO, CO
usgs-09070500 1300 - 5000 cfs IV-V(V+) 67d13h22m 900 cfs (rc= -0.1 )

RangeWater LevelDifficultyComment
1300 -5000 cfs barely runnable-high runnable IV-V(V+)

Report - Reports of Colorado 06. Hanging Lake Exit 125 (I-70) to Shoshone Power Plant Exit 123 (I-70) and related gauges

Reports give the public a chance to report on river conditions throughout the country as well as log the history of a river.

Reports

When River/Gauge Subject Level Reporter
Colorado [CO] Glenwood Canyon n/a Matt Muir
7y148d06h20m Colorado [CO] Hole At Bottom Of Dam 1200 cfs Kit Davidson
7y174d06h20m Colorado [CO] Upper Death (2) low Kit Davidson

WXPort

News




No Comments

Users can submit comments.

Rapid Descriptions

icon of message No rapids entered. If you know names, and locations of the rapids please contact and advise the StreamTeam member for this run.

Do more than just check gauges; join over 5,000 AW members today.

Join_or_Renew_Logo-200px

Join or Renew


Or, consider donating

Donate_Logo-200px

Donate


Associated News

Flow Survey for Upper Colorado River Basin

Lane Wyatt: AW's Volunteer of the Month

Management Plan submitted for Upper Colorado River (CO)

AW helps develop Upper Colorado River Management Plan

AW Preserving Boating Opportunities on the Upper Colorado River

Upper Colorado River - Project Update

Save The Colorado Campaign Awards AW (CO)

BLM Releases Draft RMP/EIS for Upper Colorado River- CO

Shape the Future of Flows in the Colorado River - Comments due January 17th!


General Nonmember Message

Associated Projects


 reach  
 state  
 reachlink  
 06. Hanging Lake Exit 125 (I-70) to Shoshone Power Plant Exit 123 (I-70), Colorado Colorado, US (mobile)