One gauge is on the river-right bridge abutment of the Green Seargent Covered Bridge, on the downstream side. The other is on the Locktown Rd. bridge on the downstream side of the river-left abutment. The Seargent bridge gauge shuld be at 2.5' minimum, and the Locktown Rd. gauge should be at .5'. (I have run this stretch at 2.0' and 0.0' one day and I wouldn't do it again.)
| Name | Range | Difficulty | Updated | Level | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Wickecheoke Creek at Stockton NJ | ||||||||||||
| usgs-01461300 | 3.00 - 8.00 ft | III-IV | 01h12m | 2.3 ft (rc= -0.1 ) | ||||||||
|
|
||||||||||||
|
||||||||||||
| When | River/Gauge | Subject | Level | Reporter |
|---|---|---|---|---|
| 2y139d12h45m | @Wickecheoke Creek Upper Creek Rd in Delaware Twp to The Covered Bridge [NJ] |
Account of 09/27/09 |
n/a | brianshea50 |
| 2y139d12h47m | @Wickecheoke Creek Upper Creek Rd in Delaware Twp to The Covered Bridge | Account of 09/27/09 | n/a | |
| 2y139d12h47m | @Wickecheoke Creek Upper Creek Rd in Delaware Twp to The Covered Bridge |
Second Drop |
n/a | brianshea50 |
| 2y140d07h04m | @Wickecheoke Creek Upper Creek Rd in Delaware Twp to The Covered Bridge [NJ] |
Account of 09/27/09 |
n/a | n/a |
| 2y154d09h07m | Wickecheoke CreekUpper Creek Rd in Delaware Twp to The Covered Bridge [NJ] |
First Drop |
n/a | n/a |
| 2y154d09h11m | Wickecheoke CreekUpper Creek Rd in Delaware Twp to The Covered Bridge [NJ] |
Second Drop |
n/a | n/a |
| 2y166d08h57m | @Wickecheoke Creek Upper Creek Rd in Delaware Twp to The Covered Bridge |
wickecheoke creek |
n/a | n/a |